MOQ : 20
Rated voltage: three-phase 380VAC (three-phase three-wire)
Trigger current: 300mA can trigger thyristors below 1000A
Auxiliary power supply: PCB board working power supply, AC220V±10% 50/60Hz
Control terminal L/N, N line must be connected to the neutral line
Input signal: control signal (0-5VDC, 0-20mA, 1-5VDC, 4-20mA) optional
Use environment: temperature -20-55℃; humidity below 90%RH
Withstand voltage: insulation withstand voltage AC2500V/1 minute
Input/output isolation voltage AC2000V
Alarm output: a group of normally open/normally closed output points (1A/250VAC)
Soft start and stop: soft start and soft stop time 1~41 seconds adjustable
Protection function: load phase loss detection, auxiliary power supply L/N reverse connection
Dimensions: 145×90×40mm
| PAK06 Series | |
| Model | PAK06 |
| Rated voltage | 3-phase 380VAC (3-phase 3-wire) |
| Trigger current | 300mA can trigger thyristor of 1000A or below |
| Auxiliary power supply | PCB board operation power supply AC220V ± 10% 50/60Hz control terminal. The L/N and N wires must be connected to the neutral wire |
| Input signal | Control signal (0-5VDC, 0-20mA, 1-5VDC, 4-20mA) optional |
| Usage environment | Temperature -10-55°C, humidity below 99% RH |
| Withstand voltage strength | Insulation withstand voltage AC2500V/1 min, input/output isolation voltage AC2000V |
| Alarm output | 1 set of NO/NC output point (1A/250VAC) |
| Start-stop time | Soft start and soft stop time 1-41s adjustable |
| Protection function | Load phase loss detection, auxiliary power supply L/N reversed connection |
| Dimension | 145×90×40mm |
Which thyristor sizes can the PAK06 drive in high-power heating systems?
The PAK06 supplies 300 mA of trigger current, enough to fire thyristors rated up to 1000 A. It is built for 380 VAC three-phase, three-wire loads. Send the load power and thyristor model to get a matching configuration.
Which control signals can connect to a PLC or temperature controller?
Selectable input signals are 0–5 VDC, 1–5 VDC, 0–20 mA and 4–20 mA. These cover most PLC analog outputs and process controllers. State the required signal type when requesting a quote.
How does soft start and soft stop protect equipment?
Soft start and soft stop times are adjustable from 1 to 41 seconds. A gradual voltage ramp reduces inrush stress on heating elements and the supply network. This also extends the load’s service life.
What protection functions reduce commissioning and maintenance risk?
The controller detects load phase loss and an L/N reversal on the auxiliary supply. A relay alarm output (one NO/NC set, 1 A/250 VAC) reports faults to the control system.
What panel-design data is needed for installation?
Dimensions are 145×90×40 mm. The auxiliary supply is 220 VAC ±10%, 50/60 Hz, and the N terminal must connect to neutral. Input/output isolation is rated at 2000 VAC. MOQ is 20 pcs.
We has over 34 years of experience in this industry and has built a
reputation for providing quality products and services at competitive prices.